Pre-Engineered Steel Warehouse Systems
1. Structural Configuration
• Primary Framework: Hot-rolled & Built-up H-beams / Columns
• Secondary System:
2. Technical Advantages
✓ Rapid Deployment: 30-50m span capability with 15-day installation cycle
✓ Material Efficiency: High strength-to-weight ratio (Q235B/Q355B steel grades)
✓ Smart Engineering: BIM-based connection detailing (HSFG bolts M20 10.9S)
✓ Sustainable Profile: 92% recyclable components with LEED® compliance
3. Value Proposition Matrix
Construction Time | 120+ days | 25-40 days |
Design Flexibility | Fixed layouts | 3D configurator |
Lifecycle | 25 years | 50+ years |
4. Our Value-Added Services
• Precision Engineering: CNC cutting with ±1.5mm tolerance
• Digital Twin Integration: Real-time budget tracking via cloud platform
• Custom Solutions:
5. Quality Assurance Protocol
Product name | Steel Workshop |
Material | GB Standard |
Surface | Painted |
Service | OEM |
OEM service available.
A dedicated team of fast response;
EN1090 & AISC & CWB & JIS Certificated Quality;
Full production line for customized products;
Close to Sea port, Convenient for visit and delivery;
150000M2 Manufacturing Area capable to take large volume