April 12, 2025
The steel frame office building was the first pilot steel structure project in Shandong Province in 2002, with a building area of approximately 3000 square meters. The shared construction period for the installation of the main structure is 10 days, which is much faster than the construction progress of similar concrete frames, and there is less water and concrete for on-site construction.